Chainsaw Action on Lot 7 (5/9/2008)
Clearing Lot 7 (5/17/2008)
Lot 7 from the Road Above (5/17/2008)
Steel Support Holes (6/20/2008)
Laying Out Foundations (6/20/2008)
Golf Course and View (7/5/2008)
View of 7 From Road Above (7/16/2008)
The Infrastructure Goes Up! (8/9/2008)
The Second Floor Starts (8/16/2008)
From the Garage (8/23/2008)
Lot 7 from the 6th Tee (8/23/2008)
Homes under Construction in Cielo Paraiso (8/28/2008)
More Concrete Poured (8/31/2008)
From Front to Back (8/31/2008)
Roof Starts on the Garage (9/6/2008)
M-2 Construction Begins (9/14/2008)
Interior Walls, Doors and Windows Appear (9/29/2008)
A House is Materilaizing (10/8/2008)
The 'Basement' (10/8/2008)
The Stairs Go Up (10/17/2008)
View from Upper Deck (10/17/2008)
Finishing the Walls (11/1/2008)
Second Floor Structure Begins (11/8/2008)
6th Green from Downstairs Master (11/15/2008)
Tee Boxes for Hole 7 from Office (11/15/2008)
Putting Roof on Second Floor (11/22/2008)
A View of Lot 7 from Lot 35 (12/12/2008)
The Kitchen from Upstairs (12/12/2008)
View from Upstairs Master Bedroom (12/27/2008)
View from Upstairs Lanai (12/27/2008)